📰 Newspapers

Vietnam picks French-Korean group for high-speed rail deal

Vietnam picks French-Korean group for high-speed rail deal

When completed, the high-speed rail project is set to have a total length of approximately 1,541km.

Vietnam has selected a consortium of eight French, South Korean and Vietnamese contractors for a 10.24 trillion dong (S$511 million) contract for surveys, feasibility study and design for the North-South high-speed railway, one of the country’s flagship infrastructure projects.

The consortium, led by France’s Systra, includes three South Korean firms: Sambo Engineering, Yooshin Engineering and Korea National Railway, according to the Vietnamese construction ministry’s news website.

The project management board aims to sign a contract with the group in November.

Under the 30-month agreement, the group will conduct surveys and a feasibility study, carry out front-end engineering design (FEED) and prepare bidding documents for the construction phrase, according to state media.

The work will help determine the project’s technology and investment options, providing the technical basis for subsequent implementation.

The decision marks the first concrete step in Vietnam’s push to build a roughly US$65 billion (S$83 billion) high-speed railway linking Hanoi and Ho Chi Minh City, a project expected to reshape transport and economic links along the length of the country.

Construction of the planned line, one of the nation’s biggest-ever infrastructure undertakings, was delayed by a year until the end of 2027 after Vietnam said in September that implementation has been slower than expected.

The group, which includes four Vietnamese companies, is tasked with identifying the route and key…

In brief

Vietnam has selected a consortium of eight French, South Korean and Vietnamese contractors for a 10.24 trillion dong (S$511 million) contract for surveys, feasibility study and design for the North-South high-speed railway, one of the country’s flagship infrastructure projects. The consortium, led by France’s Systra, includes three South Korean firms: Sambo Engineering, Yooshin Engineering and Korea National Railway, according to the Vietnamese construction ministry’s news website.

This is the opening of the story, shared with credit to The Straits Times — Asia. The rest of the report — with every detail — continues on the publisher’s website.

Continue reading at The Straits Times — Asia ↗

Cookie settings

Choose which cookies we may use. You can change this at any time from Cookie settings in the footer. Details of each cookie are in the Cookie Policy.

Strictly necessary

Needed for sign-in, security, payments and remembering these choices. Always on.

Preferences

Remember settings such as dark mode.

Analytics & performance

Help us count visits, understand which pages, devices and countries our readers use, and measure how well the site performs – anonymous and aggregated.

Advertising & marketing

Lets advertising partners show and personalise adverts, measure impressions, clicks and visits, prevent ad fraud and pay us – this is how the free site is funded.

🔔 News notifications

Get headlines from NewsHub on this device — even when the site is closed.

You can switch this off at any time. Works on Android, Windows, Mac and Linux browsers; on iPhone/iPad add the site to your Home Screen first.