BATAAN, Philippines – Time seems to have stood still inside the Bataan Nuclear Power Plant (BNPP), where a vision of the Philippines’ energy future has lain dormant for four decades.
Some of the machinery remains wrapped in the plastic it came in, while much of the original paintwork remains intact. Elsewhere, rust has crept over metal stairways and cobwebs have gathered, marking the passage of time in a facility that has never generated electricity commercially.
In some parts of the plant, the lights are switched on only when visitors come through. Some original fittings have been replaced with energy-saving LED bulbs, a small concession to modernity in a facility that has otherwise remained largely unchanged since the 1980s.
Now, 40 years after the plant was mothballed, the Philippines is making one of its most concerted pushes yet for nuclear energy. The government is exploring foreign nuclear technologies, identifying potential sites and drawing up plans to award a nuclear power project by the end of 2027.
But the shadows of the past loom over President Ferdinand Marcos Jr’s renewed nuclear ambitions: the legacy of his father’s dictatorship, allegations of corruption that dogged the construction of the power plant, and longstanding safety concerns that have fuelled resistance to its revival.

